PURFLEX®-economy

For extremely low installation heights during modernisation

The thin layer PURFLEX®-Economy system is used when a floor heating system with extremely low installation heights is to be installed.
The laying mortar is easy to use and can be exposed to loads already after a short time. The system is optimally supplemented with bonding mortar and joining mortar for subsequent laying of the floor lining.

The PURFLEX®-System by EMPUR® has many uses: 

  • in in new and old buildings
  • in in residential and commercial buildings
  • in in single family houses and buildings for multiple families
PURFLEX®-Economy
Easy modernisation with PURFLEX®-Economy

EMPUR® PURFLEX®-Economy impresses with

  • Low installation height >= 18 mm
  • High flexural strength and point load resistance
  • Can be exposed to loads after a short time and enables quick construction progress
  • Low surface area weight - ideal for renovating old buildings
  • Quick reaction time thanks to minimal pipe overlap
  • Detailed photos

    Detailed photos

    Low weight of material
    Simple processing
    Easy modernisation
    PURFLEX® joining mortar
    PURFLEX® bonding mortar
    PURFLEX® laying mortar
    System construction with clip rails
    System construction with Exclusiv-Klett
     
  • Benefits for the processor

    • One system, one manufacturer - from consultation to design and on to component delivery
    • Security for end-clients and processors - system components optimally adapted to each other
    • Low installation height (<=18 mm), only 8 mm of load distribution layer above the heating pipe
    • Simple processing
    • High flexural strength and point load resistance
    • Flexible laying of the KLIMAPEX® plastic heating pipes thanks to the use of clip rails
    • Low weight of material
    • Can be exposed to loads soon (48 hours after application of the levelling screed all other work steps can be carried out in 24-hour intervals)
    • Laying is carried out without insulation
    • Simple and secure installation of KLIMAPEX® plastic heating pipes by clicking them into the clip rail (rail system)
    • Secure fastening of the KLIMAPEX plastic heating pipes using the pipe retaining lugs of the clip rails (rail system)
    • Quick and flexible laying of pipe dimensions and qualities of the same system
    • Optimal distribution of the PURFLEX®-super laying mortar around the KLIMAPEX® plastic heating pipe
    • Low surface area weight, ideal for renovating old buildings
    • Quick reaction time thanks to minimal pipe overlap
    • Many expansion possibilities - comprehensive EMPUR® range with various system accessories and tools, as well as manifold and control technology products
    • High thermal conductivity
    • Easily connected to existing heating systems
    • 10-year material and consequential damage liability on EMPUR® heating pipe with exclusive use of our system components under adherence to further warranty conditions (see EMPUR® warranty certificate)
  • Benefits for the end-consumer

    • One system, one manufacturer - from consultation to design and on to component delivery
    • Security for end-clients and processors - system components optimally adapted to each other
    • Simple and secure installation of KLIMAPEX® plastic heating pipes by clicking them into the clip rail (rail system)
    • Secure fastening of the KLIMAPEX plastic heating pipes using the pipe retaining lugs of the clip rails (rail system)
    • Heat insulation across the entire surface
    • Optimal distribution of the PURFLEX®-super laying mortar around the KLIMAPEX® plastic heating pipe
    • Low surface area weight
    • Quick reaction time thanks to minimal pipe overlap
    • Many expansion possibilities - comprehensive EMPUR® range with various system accessories and tools, as well as manifold and control technology products
    • No swirling up of dust, suitable for people with allergies
    • Highest comfort thanks to heat radiation
    • New design possibilities without heaters
    • Increases building value
    • Energy savings through low flow temperatures
    • Easy modernisation - retrofitting possible
    • Barrier-free modernisation options
    • Extremely low installation height (>=18 mm), only 8 mm of load distribution layer above the heating pipe
    • Can be exposed to loads soon (48 hours after application of the levelling screed all other work steps can be carried out in 24-hour intervals)
    • Floor lining can be applied directly
    • Easily connected to existing heating systems
    • 10-year material and consequential damage liability on EMPUR® heating pipe with exclusive use of our system components under adherence to further warranty conditions (see EMPUR® warranty certificate)

We are happy to answer any questions you might have regarding PURFLEX®-Economy!

The respective departments in our plants are always at your disposal if you require advice. Or simply use our contact form!